Stratco – Solar Panel System

Written by mtwmedia on . Posted in Blog, Featured Work, Time-Lapse

20120623-012924.jpg

Shooting on location at North Haven marina for Stratco. The second of three installation shoots for the new interrogated solar panel system.

Below is the timelapse of the installation which was shot over two days.

Tags: , , , , , , , ,

Trackback from your site.

mtwmedia

MTW Media Man. Editing/Camera/Production/online posts.

Tweet Feed